COMPANY |
OBJECT |
EQUIPMENT |
OJSC «RusGidro» |
Votkinskaya Hydro Power Plant |
2PTS-1600 kVA |
Gissarakskaya GES, Uzbekistan |
Gissarakskaya Hydro Power Plant |
DC Board-220 |
OJSC «Gruppa Е4» |
OJSC «TGK-4». Boiler installation in North-west area of Kursk City |
Block-Modular Buildings with LVCD for Gas Turbine Installation control |
OJSC «Kontsern Rosenergoatom» |
Kurskaya Nuclear Power Plant Reactor Shop-2 |
Metal-clad control unit for turborefrigirating unit МТХМ1-25Р |
Rostovskaya Nuclear Power Plant |
Relay panels of outdoor switchgear 500 kV |
OJSC «NIAEP» |
Open SwitchGear 500 kV of power generation trains №3, №4 of Rostovskaya Nuclear Power Plant |
Relay Protection and Automation cabinets |
MUP «Vodokanal», Khabarovsk City |
Water Extraction Installations of Tungusskoe field |
Relay Protection and Automation cabinets |
OJSC «TGK-5» |
Dry Fuel Ash Compressor Unit at site of Novocherkasskaya Hydro Electrical Power, power generation train №9 |
Compressor Unit Automation System |
OJSC «FSK EES» |
Reconstruction of substation 220/110 kV, Kunashak |
Back-up Protection and Automatic Control for HV line 220 «Shagol» |
OJSC «FSK EES» - Main Power Transmission Lines of Volga |
Substation 500 kV «Krasnoarmeyskaya» |
АК1 Back-up Protection and Automatic Control cabinet for circuit-breaker QZ4C 500 kV |
Yuzhno-Uralskaya Hydro Power Electric Plant |
Reconstruction of substation 500 kV, Kurgan City |
Basic Protection Cabinet for HV Line-500, Back-up protection cabinet for HV Line-500 |
PJSC «MRSK Severnogo Kavkaza» -Stavropolenergo |
Technical re-equipment at Substation 110 kV. Reconstruction at Substation 110 kV «Zalukokazhe», «Podkumok», «Georgievskaya» |
Phase-Differential Protection cabinet for 110 kV Line, Breakers Control Automation 500 kV |