COMPANY |
OBJECT |
EQUIPMENT |
OOO Gazprom transgaz Nizhniy Novgorod |
CS (Compressor station) Zavolzhskaya |
Low-Voltage Switchgear-0,4 kV panels for PTS (Package Transformer Substation) of Gas Air Cooling Unit, PTS of Operation and Maintenance Block, Gas Air Cooling Unit panel |
CS Torbeevo |
MCC panel with emergency lead-in based on withdrawable modules for Gas Compressor Unit |
OOO Gazprom transgaz Kazan |
GPU N1 Urengoi-centr-2 |
MCC panel |
OOO Gazprom transgaz Ufa |
Kanchurinsko-Musinskiy complex for underground gas storage |
Plantwide MCC panels, DC Board, Gas Air Cooling Unit panels, 2CCTS-1000 kVA, 2PTS for units-250 kVA, 2CCTS-400 kVA, LV switchgear panels, UPS 20 kVA |
Compressor department of Karmaskalinskoe Line Production Department of Main Pipelines |
DC Board panels, MCC, 2PTS-630 kVA |
OOO Gazprom transgaz Ukhta |
CS Yubileynaya, Sindorskaya, Babaevskaya, Nyuksenitsa, Sosnogorskaya, Mikun, Urdoma, Privodino |
DC Board panels, MCC, 2PTS-630 kVA |
OOO Gazprom dobycha Orenburg |
Booster compressor station-1, Booster compressor station-2 of gas processing plant Gelievyy zavod |
ЩMCC panels with withdrawable modules, Automated Capacitor Unit |
Reconstruction of II branch of condensate pipeline GTU-16 Karachaganakskoe OGCF-GPP for crude gas transportation from Karachaganakskoe OGCF |
2CCTS25, 2CCTS40 |
Orenburg OGCF gas mining facility retrofitting and upgrading |
MCC panels, 2CCTS-400kVA |
Connection of further development wells of the main gas condensate field of the Orenburg OGCF |
Modular building with Input Distribution Device (IDD), Modular building with substation 2PTS BM-100 TMG-6/0,4 with sealed dry transformer |
OOO Gazprom dobycha Yamburg |
2nd and 3rd steps of Zapolyarnoe GTU |
MCC panels |
Construction of the Cenomanian deposits of oil and gas condensate field Tazovsky GTU |
LV switchgear panels, PTS-630 |
Sports and recreation complex of the rotators' camp on the UKPG-2 (6) of the Yamburg Gas treatment unit |
IDD panels, IDD control center, pole-mounted PTS-400/6/0,4 -UHL1 |
Polar gas turbine power plant. 2nd stage of construction. Thermal mechanical unit (pos. 2) |
2PTS-1000-6/0,4 for auxiliaries, PTS-400/6/0,4 |
OOO Gazprom dobycha Noyabrsk |
Booster compressor station (BCS) of Zapadno-Tarkosalinskoe field |
Automated Capacitor Unit |
Vyngapurovsky gas complex |
6kV DB |
Construction of Chayanda OGCF |
LV switchgear |
BCS of Nijne-Kvakchinsky GCF |
PTS 10/0.4 kV, 1600kVA |
OOO Gazprom dobycha Nadym |
Bovanenkovskoe OGCF. Medvezhye OGCF Electrical supply for Komsomolskiy gas unit |
MCC panels |
OOO Gazprom dobycha Astrakhan |
Reconstruction of 3, 6 production of АGPP |
PTS, MCC panels |
Reconstruction of 1st and 2nd phases of Automated Hydrological Complex |
MCC panels |
OOOGazprom transgaz Surgut |
CS Priobskaya, Demiyanskaya, Aganskaya, Vyngapurovskaya, Samsonovskaya, Gubkinskaya, Yarkovskaya, Tobolskaya, Bogandinskaya, Ortiyagunskaya, Purtazovskaya, CS-00 Novo-Urengoyskaya |
2PTS for outdoor installation-400 kVA, 2PTS for outdoor installation-630 kVA, Low-Voltage Switchgear-0,4 kV for 2PTS for outdoor installation-1000 kVA, DC Board, MCC for units control, MCC panels, Gas Air Cooling Units panels |
OOO Gazprom transgaz Kazan |
CS Arskaya |
MCC panels for units control, Gas Air Cooling Units panels, DC Board |
OOO Gazprom transgaz Moskva |
CS Kamensk-Shakhtinskaya, Voskresensk |
MCC panels, 2PTS for outdoor installation-100 kVA |
OOO Gazprom transgaz Samara |
Togliattinskoe, Pavlovskoe, Syzranskoe Line Production Departments of Main Pipelines |
Gas Air Cooling Units panels, Oil Air Cooling Units panels, Automated MCC of Gas Compressor Unit |
OOO Gazprom transgaz Yugorsk |
CS Karpinskaya, Sorumskoe, Nijneturinskoe and Uralskoe Line Production Departments of Main Pipelines |
MCC panels, MCC for control units |
OOO Gazprom transgaz Volgograd |
CS Kalininskaya |
Gas Air Cooling Units panels |
OOO Gazprom transgaz Tomsk |
CS Omskaya |
MCC panels |
Main gas pipeline Power of Siberia. Stage 2.4. Section CS-3 Amginskaya - CS-4 Nimnyrskaya |
LV switchgear |
Main gas pipeline Power of Siberia. Stage 4.2. Compressor station CS-7a Zeyskaya. Health care facility No. 5 in Svobodny |
LV switchgear |
OOO Gazprompererabotka |
Surgutskiy Condensate Stabilization Plant, Booster compressor station of Vyktulskoe Gas Production Department |
MCC panels, Low-Voltage Switchgear-0,4 kV, DC Board-220, DC Board-24 |
Plant for preparation of condensate to transportation |
MCC panels |
Condensate stabilization unit for Achimov deposits in the Nadym-Pur-Taz region |
MCC, PTS, heat tracing panels |
Infrastructure of the main transportation of hydrocarbons of gas-condensate deposits of the Polar OGCF. Base for liquid hydrocarbons transportation in the area of the Zapolyarnoye OGCF. |
CCTS-630/6/0,4-UHL1 |
A branch of Orenburg gas processing plant, Shop No. 9 |
Auxiliaries panel |
Amur Oil Refinery |
LV switchgear panel |
OOO Gazprom invest Zapad |
CS Sheksninskaya, CS Babaevskaya, CS-13 Urdoma, CS Nyuksenitsa, Gryazovetskiy gas hub, CS Sindorskaya, CS Portovaya |
MCC panels, 2CCTS-1000 kVA, 2PTS for units-1000 kVA, 2PTS for units-250 kVA, ACU, 2CCTSА-400/10/0,4 kV, 2CCTS-1600/10/0.4, 2CCTS-1000/10/0.4, 2PTS-1000/10/0.4, APSCS panels |
OOO Yamalgaz-Invest |
CS Ivanovskaya, CS Lukoyanovskaya, CS-9 Maloperanskaya compressor department-1, CS-2 Yarynskaya compressor department -1, CS Usinskaya, compressor department -1, CS-8 Chikshinskaya, belong within construction of Main pipeline system Bovanenkovo-Ukhta |
MCC panels, Automated Transfer Switch cabinets |
OOO Gazprom invest Vostok |
Base area of Amurskoe Line Production Departments of Main Pipelines |
MCC panels |
OOO Gazprom invest Yug |
Enrichment sites of Peschano-Umetskoe underground gas storage. Reconstruction of Sovkhoznoe underground gas storage |
MCC panels |
OOO Gazprom dobycha Shelf |
Onshore technological complex |
MCC panels |
OOO Tomskgazprom |
Development of the Myldzhinsky field. BCS. Construction of Kazan OGCF |
Industrial 2PTS-1000kVA, auxiliaries’ panels |
Gas and condensate processing plant of the Kazan OGCF |
Indoor DB-6kV |
Main compressor station of the North-Ostaninsky oil field |
Industrial 2BPTS-1000/6/0.4 kV |
Construction of Kazan OGCF |
Two-transformer kiosk-type PTS for power distribution, dead-end, with air input from HV side and cable output from the LV side |
Terminal for storage and shipment of LPG near Kuybyshev |
|
OOO Gazprom Dobycha Urengoy |
Urengoiskoe OGCF |
LV switchgear panels, containerized modules for LV switchgear panels |
Arrangement of the second experimental site of the Achimov deposits of the Urengoy OGCF for full development |
LV switchgear |
Connection of gas-condensate well clusters to the CGTP-22 of the second pilot site of the Achimov deposits of Urengoy OGCF |
Industrial 2BPTS-1000/10/0.4 kV |
OOO Gazprom Gazomotornoye Toplivo |
Construction of automatic gas filler in Ryazan. |
PTS-400kV |
Automatic gas filler in Berdsk |
PTS-400kVA |
Automatic gas filler Yugra |
PTS-400kVA |
Automatic gas filler in Almetyevsk |
PTS-1000kVA |
Automatic gas filler Aksarayskiy |
PTS-250kVA |
OOO Gazprom Energo |
10 kV cable lines for Chayanda OGCF |
220 V DC system, 10/10 kV transformer substation |
OOO Gazprom Pererabotka Blagoveshensk |
Amur gas processing plant |
LV DBs, heat tracing cabinets |
OOO Gazprom Sotsinvest |
Logistic center of PAO Gazprom |
Indoor switchgear – 10 kV |
OOO Gazprom Invest |
Modernization of I and II generation of Astrakhan gas complex as an integral industrial facility |
LV DBs |